Fixed price or hourly rate: what each really means
Where the risk sits in each, and how to be fair to both sides.
Short answer: neither is automatically cheaper or safer. A fixed price can include a large cushion for the unknown, and extra work can still be added if problems appear. An hourly rate keeps you in control of what you pay for, but the total is open. The best protection is an itemised price with unknowns handled separately.
The two options side by side
Fixed price
One agreed total for a defined scope.
- You know the starting cost
- Easy to budget and to compare
- May hide a big cushion for unknowns, sometimes several times the real cost
- Extra work can still be added when problems appear
- Needs a clear written scope
Hourly or day rate
You pay for time worked, plus materials.
- You pay for work actually done
- No padding for risks that never happen
- Flexible if the plan changes
- Final cost is open-ended
- Slow or extended work costs you more
- Hard to compare quotes
The catch with both
- Fixed does not mean finalWhen something unexpected appears behind a wall, extra work is often priced on top.
- Padding is invisibleA contractor worried about surprises can price high to cover them. You can't see how much is cushion.
- Hourly can run onUnforeseen problems extend the work, and you pay for every extra hour.
Both are normal in the trade. Problems really do appear in bathrooms, and someone has to pay for them. The question is whether that cost is hidden in the price or shown openly.
Which one fits your job?
- Full bathroom renovationItemised fixed price plus a separate allowance for unknowns.
- Tiling a defined areaFixed price per area, with edges and preparation listed.
- Repairs and small fixesHourly or day rate with an estimate.
- Unknown problem (leak, damp)Day rate to investigate, then a fixed price to fix.
Make either one fairer
- Ask for an itemised breakdown (preparation, plumbing, tiling, fittings), not one lump sum.
- Written scope: what is included, what is not and who buys materials.
- Ask what happens if a hidden problem appears: who decides, at what rate, and with whose approval?
- Hourly: ask for an estimate, a weekly cap and a sign-off for anything above it.
- Payment in stages tied to progress, not everything up front.
- A proper invoice (fatura) for every payment.
Our recommendation: a fixed, itemised price for the work that can be defined, and a separate allowance or agreed day rate for unforeseen problems, used only if they appear and only with your approval. You get a known starting cost without paying a hidden cushion. Keep a reserve in your own budget either way.